This resource is no longer available

Cover Image

Responsible for nearly 51 million customer journeys each year and about 8,000 km, Queensland Rail operates passenger services throughout Queensland, Australia.

In 2018, with the advent of the Commonwealth games, The Australian government expected 1.5 million visitors to descend on the state.

In response Schneider Electric was tasked with designing a new substation using a range of solutions based on EcoStruxure Power, including:

  • Gas-insulated switchgear
  • Protection relays
  • Industrial UPS system
  • And more

Download the full case study to see how Schneider Electric’s substation fueled reliability for Queensland Rail.

Vendor:
Schneider Electric
Posted:
May 16, 2024
Published:
May 16, 2024
Format:
HTML
Type:
Case Study

This resource is no longer available.